03

Floor Coatings

High-build epoxy and protective coatings for floors that take a beating.

(01)The service

High-durability coatings for interior and exterior surfaces — safety and pedestrian zones, anti-slip finishes and full surface preparation, meeting MPI, WorkSafe and NZ Health & Safety visibility standards. Our own sweeping and scrubbing fleet preps every surface before a coat goes down, and we deliver across the North Island around your operating hours.

(02)What’s included
Epoxy & polyurethane systems
Anti-slip finishes
Concrete grinding & prep
High-grip / Permagrip surfaces
Line-integrated coatings
Overnight & staged application
Epoxy coating applied across a warehouse floor
Coated plant room floor
Coated corridor floor
Anti-slip pedestrian crossing coating

How it works

(03) Process
Step 01 Grind & prep Surfaces are ground, repaired and cleaned so the coating bonds properly and lasts.
Step 02 Coat & cure Systems applied in controlled coats and given time to cure to full strength.
Step 03 Mark & seal Lines and finishes integrated, then sealed and handed back ready for use.

Common questions

FAQ · Floor Coatings
Q1 How long does a floor coating job take?

It depends on the area, the condition of the slab and the system going down. Many jobs are programmed over a weekend or shutdown; we confirm the timeline when we scope the site.

Q2 Will the coating stand up to forklifts and heavy traffic?

Yes — we spec industrial-grade systems matched to how the floor is used. The site walk determines the right system for your traffic and loads.

Q3 Do you prepare the floor first?

Always. Proper surface prep is part of the job — it's what makes the coating last.

Q4 What areas do you cover?

Auckland, Hamilton and the wider Waikato, and the upper North Island. Call 0800 101 290 if you're not sure we reach you.

Q5 What surfaces can be coated?

Interior and exterior concrete — warehouse floors, walkways, loading docks and forecourts — with anti-slip finishes where grip matters.

Q6 Can safety zones be built into the coating?

Yes — pedestrian walkways, hazard zones and bay markings can be designed into the coating system and delivered in one programme.

Q7 How do we keep downtime to a minimum?

Jobs are staged area by area and usually programmed over weekends or shutdowns — most sites keep operating while we work.

Leave us at least one way to reply: name, email or phone.

Photos & videos

Providing additional supporting documentation, such as photos or videos, will help us better prepare ahead of our site visit and ensure we can scope the job as accurately and efficiently as possible.

Drag & drop, or browse files Up to 12 files · photos ≤10 MB · videos ≤50 MB
We’ll reply within one business day.
Get started

Need Floor Coatings? Consider it Done.

Send a few photos or a short walk-through and we'll scope it, price it and come back to you within one business day.

One team for every site problem
Work scheduled around your hours
Free quotes, no site visit needed to start
Or call us 0800 101 290
Next: Building & Water Wash

Request received.

Thanks, your details are on the way to the KP team. We’ll be in touch within one business day. Consider it done.

0800 101 290 Get a quote